Home / Services

We do power well.

From feasibility to turnkey. One contract, one responsibility, one grid.

0.4–220 kV lines, substations

Overhead line and substation build, repair, testing, commissioning. 0.4 kV to 220 kV.

  • 0.4–220 kV overhead lines
  • Substations, relay protection
  • Repair, testing
0.4–220 kV lines, substations
Design, feasibility

Design, feasibility

Working drawings and techno-economic justification for energy construction.

  • Working drawings
  • Feasibility
  • Permits
Testing, commissioning

Testing, commissioning

Measurement, testing, relay-protection automation as daily practice.

  • Measurement
  • Commissioning
  • Protocols

Process: 3 steps

01
Design, feasibility — 2–4 weeks
02
Build, testing — scheduled
03
Handover — protocols, warranty